Brief
Ahlatçı is a 6.37 MW ground-mount solar plant at Ahlatçı Holding’s Çorum İskilip site, energised in 2025. Truaxis carried steel-structure assembly, panel installation and DC-side execution under one contract — with driven-pile foundations verified by pull-out testing before serial installation.
What Truaxis delivered
-
01
Contracted execution — steel-structure assembly, panel installation and DC-side work under Truaxis project management.
-
02
Driven-pile foundations with çakma-çekme pull-out testing on hill terrain before serial install.
-
03
Galvanised fixed-tilt structure matched to site contours, module-table layout and bracing.
-
04
Module mounting, DC stringing and DC-side wiring as integrated steel + electrical scope.
-
05
DC system tested and handed over in 2025 for Ahlatçı Holding’s self-consumption plant.
06 — Contact
Planning a utility-scale solar project?
Share the site parameters and project stage. We’ll assess tracker fit, engineering scope and next steps.
Email us — info@truaxisenergy.com